500l turnkey nano brewery for brew pub |
Brewery System | Components | Capacity | Specifications |
Crushing system | Miller | 250kg-500kg/h | Adjustable double roller, |
Brewhouse | MLT | 500L | 1. Brewhouse vessels can be customized.: 2/3/4 vessels. |
2. Heating way can be customized: electric heating, |
BWT | 500l | steam heating and direct fire heating. |
Water System | Hot water tank | 500/700L | Use for mashing water |
Ice water tank | 1500L | Use for wort cooling, Fermenter and BBT. |
Brazing chiller | 5HP | Use for IWT cooling, R404A. |
Fermenting system | Fermenter tank | 500/1000L | Dimple plate jacket for cooling, Manhole in the side. |
Bright beer tank | 500/1000L | Carbonation stone for fill Co2, Make beer clearly. |
Control system | Digital display | Square table | Each square table corresponds to a control part |
PLC | instrument panel | Control all tank’s temperature, motor, pump show on/ off |
Cleaning system | CIP car | 50L | Cleaning all tanks buy Alkali and disinfectant |
Optional |
1. Auger system/ Hopper/Grist Hydrator. |
2. Beer bottle machine, Beer keg machine. |
The brewhouse system is composed of mash tun/ lauter tank, kettle,/whirlpool, , hot water tank, hops back,
plate heat exchanger with oxygenation device, wort pump etc.
The water and wort step heating is controlled by Digital Display program and completed automatically.
The Cooling system is composed of Ice water tank, Brazing chiller and ice water pump,
The water step cooling is controlled by Digital Display program and completed automatically.
Cooling structure is dimple plate jacket.
Water System |
Hot water tank TECH SPECS: Total Volume: 625/875L Effective volume:500/700L Diameter:1160mm Overall Height: 2050/2250mm Manhole:450*320mm Material: Food Grade stainless steel 304 | |
| Ice water tank TECH SPECS: Total Volume: 1875L Effective volume:1500L Diameter: 1460mm Overall Height: 2100mm Manhole: 1460mm Material: Food Grade stainless steel 304 |
Piping and Pump Description: Including recirculation pipes Pump Capacity: 3T/H Motor: 1.5 kw Copper brazing heat exchangers(Optional) | |
Fermenter system is composed of fermenter tank, bright beer tank, yeast added tank, etc.
The tradtional design of the fermenter’s cylinder and cone is double-jacket, the seal head is single-jacket, based on the original design,
we have developed the energy-saving equipment with double jacket seal head, favored by customers.
Fermenting system |
Fermenter Tank TECH SPECS: Total Volume: 625/1250L Effective volume: 500/1000L Diameter: 1060/1260mm Overall Height: 2100/ 2500mm Manhole: 450*300mm Dimple plate:Yes Pressure regulation: 1.5-2 bar Material: Food Grade stainless steel 304 | |
| Bright Beer Tank TECH SPECS: Total Volume: 625/1250L Effective volume: 500/1000L Diameter: 1060/1260mm Overall Height: 2100/ 2500mm Manhole: 450*300mm Dimple plate: Yes Pressure regulation: 1.5-2 bar Material: Food Grade stainless steel 304 |
Control system |
Digital Display Simple operation, easy maintenance. Cabinet material: stainless steel. Function: Show brewhouse tanks temperature, turn on/off all motors and pumps by button, control all fermenting parts temperature, chillers soft start | |
| PLC Programmable, stable, Brewing recipes can be stored. Cabinet material: stainless steel Function: Show and control brewhouse tanks temperature, step heating is automatic, turn on/off all motors and pumps by touch screen, control all fermenting part. |
500L Red Copper cladding brewery for US Customer.
1. 500L Mash/Lauter tun, Kettle/Whirlpool tun, 500L Hot water tank.
2. Electric heating way.
3. 6*500L fermenter tank.
4. 2*500L bright beer tank.
5. 1500L Ice water tank with 5HP Brazing Chiller.
6. Digital Display control system.
7. 50L CIP car.
Use for a small bar.
The pictures we showed from customer local factory when our engineer service here.
500l turnkey nano brewery for brew pub
(1) Brewhouse: mash/lauter tun + Lauter tun + Heating exchanger
(2) Fermenter tank + bright beer tank
(3) Ice water tank + Chiller.
(4) Pumps +Miller+ Accessories.
All parts loading in one 40ft container.
-Training at Supplier how to set up the system
1. we will install the equipment in our factory , and testing the equipment working situation,at the same time,
we have worker will take the installion video for you , our service team provide on line install guide.
( provide install drawing for customer reference.)
2. we are welcome customer visiting our factory, after the equipment production finished, the customer can come to Jinan,
We are happy to demonstrate live installation and winemaking for our customers. ( provide install drawing for customer reference.)
3. we have the after-sales service team, they can fly to your local helping install.
-Training at Supplier how to maintain the system
1. We will inform the customer of the use of equipment precautions, and provide spare parts before the equipment transport.
2. The contact must be numbered and kept in the user's file.he sales staff regularly contact the customer,
provide the appropriate technical guidance.
3.The after-sale personnel have received uniform training and there is round-the telephone service -Clock aftermarket,
ensuring that the problems raised by customers are resolved in time.
-How the service will be arranged?
1. The buyer and seller sign a trade contract and the terms of the contract are negotiated by both parties.
2. Trade terms are constructed by Chinese and English bilinguals to prevent the occurrence of unclear terms,
3. All the terms of the service in the trade contract embodied, to ensure that customers enjoy the services.
4. Trade contract with official seal and general manager of the company signed.